Uttar Pradesh Set to Target 4.3GW of Rooftop Solar Installation as per the new Draft ̵ | Jul 2017

With the operating period of the current solar policy of Uttar Pradesh already having expired on March 31, 2017, the Uttar Pradesh....

Link Button