Gujarat

SOLAR POLICY FOR Gujarat

Change State

Rooftop Solar

INDUSTRIAL

APPLICABLE POLICIES

Gujarat Solar Policy and it's Solar Highlights

Gujarat is located on the Western coast of India and is called the "Jewel of Western India". Purely in terms of the geographical area, it is the 6th largest state in the country. With a proposed target of 8020 MW, Gujarat is set to become the fourth largest state in India when it comes to the installed rooftop solar capacity by 2022. This would put Gujarat, behind states likes Maharashtra, Uttar Pradesh and Tamil Nadu for grid-connected rooftop power. Currently, Gujarat alone accounts for 2.6 GW of commissioned solar power in India with about 570 MW being added in the FY 2018/19. It is one of the fastest-growing states when it comes to solar deployment- both for rooftop as well as large-scale solar projects. Very recently, the airport of Ahmedabad also commissioned a 700kWp rooftop solar plant outlining the push from the state government towards installing solar. There have been successful subsidy lead programs, awareness drives as well as strong policies that have been formulated to ensure the rapid progression of rooftop solar in the state. Gujarat is also a home to Charanka Solar Park that is being constructed on a 2,000 hectare land in Norther Gujarat, encompassing 19 different solar projects. The solar park is expected to host at least 790 MW solar power systems when it is fully completed and commissioned.

My Sun Calculator Book your Solar System for just 6,999 and build your personalized payment plan with Flexi-payTM.

Close
Loader

Please wait while your personalized Solar Savings Report is being generated. Do not close this screen for the process to be completed. It might take a couple of minutes.